2f3e5fd0

2.2.8.2. Installation of a case

Fig. 2.135. Places of putting sealant


Remove old sealant. Be careful, do not damage contact surfaces. Using an edge and a scraper, remove old sealant from contact surfaces and from deepenings under sealant. Carefully clear all components before installation. Using bezosadochny solvent, clear surfaces before putting sealant. Apply fresh sealant on a case, as shown in the figure 2.135.

Fig. 2.136. Location of lock consolidation: 1 – lock consolidation


Establish new ring consolidation (fig. 2.136).

Fig. 2.137. Tags of installation of balancer shafts and conrod neck: 1 – neck No. 1; 2 – tags


Orient tags on balancer shafts and a conrod neck No. 1, as shown in the figure 2.137.

Fig. 2.138. Order of tightening of bolts of fastening of a case


Establish a case. Evenly, for several passes, tighten bolts of fastening of a case in the inhaling of 33 N shown in the drawing 2.138 sequences by the moment · m.

Fig. 2.139. Tags of installation of balancer shafts and spline: 1 – tags; 2 – spline


Check combination of tags, as shown in the figure 2.139.

Fig. 2.140. Installation of the VVT-i oil filter


Establish a cap, having applied sealant on a carving and tighten its moment inhalings of 26 N · m. Establish the VVT-i oil filter and tighten its moment inhalings of 30 N · m (fig. 2.140).

Fig. 2.141. Installation of the drain crane


Wrap the drain crane the moment of an inhaling of 25 N · m, having applied sealant on 2–3 rounds of a carving. Having tightened the crane the necessary moment, turn it clockwise until the opening for discharge is not below (fig. 2.141).

Fig. 2.142. Laying of a head of the block of cylinders: 1 – number


Install the union of the oil heater (model with the oil heater). Establish laying of a head of the block of cylinders (fig. 2.142).